Prefabrication Pipe Welding & Fitting Experts
We have a long established and skilled work force, fully trained in their disciplines and equipped with the necessary plant, tools and machinery required to carry out contracts in a competent and professional manner. Where stringent procedures are employed, to ensure that the highest standards of workmanship achieved.
Featured Projects
Recent contracts outlining the type, size and nature of works carried out by our company.
Battersea Power Station
2020
Client – Vital Energy
Our role consisted of undertaking all mechanical distribution of gas and drainage pipework centrally in the Energy Centre as well as the Dry Air coolers. This has assisted the completion of the Energy centre which is core to the overall running of Residential, Commercial, and Retail areas of the riverside Landmark.
This job will extend to Phase 3B, which will assist in the redevelopment of a 16-level residential building as well as a 13-level commercial building.
22 Bishops Gate
2019
Client – MJL / Multiplex
Delivery and installation of LTHW, and CHW condenser pipework in the Plant-room. Additionally, our role involved the fabrication and installation of 600mm condenser risers, as well as CHW and LTHW primary risers as well as CHW and LTHW primary risers that operated up through 57 floors.
Bloomberg Offices, 50 Canon Street
2017
Client – Sir Robert McAlpine / MJL
Pipe Services Ltd. fulfilled the delivery and installation of Chilled Water Systems, Fit Out on all floors in the new Headquarters of Bloomberg L.P.
Our Services
From the factory, which is located in Kent, we are able to pre-fabricate pipework as per the client’s drawings and specification, then deliver to site.
We have recently started to pre-fabricate screwed pipework at our factory to allow even quicker turnover of all pipe work and valve sets. We still have the site based staff on most contracts, but have found that pipework can be made quicker at our factory, without the other trades delays being a problem.